
Concrete Driveway Building
A drive here is a replacement, not a first pour. The tract it belongs to went in between 1980 and 2000, and the panel out front is cracked from joints cut shallow and late. We break it out, rebuild 4 inches of compacted base, run number 4 bar and cut the joints the day we pour.









