
Concrete Driveway Building
A drive on a 5 acre parcel is a length of road, and the granite under it is both the obstacle and the answer: it stops a trencher, and once broken and crushed it makes first-rate base. We pour 6 inches where a water or propane truck shares the run with the family car.









